So, we’ve finally made a proper start. The old industrial unit, which has sat unloved and empty for as long as we’ve lived in Istria, is being internally dismantled in preparation for the major renovations. A scaffold unit, an extendable ladder and a demolition drill have been added to our arsenal of tools and equipment, and we’re off! Sensibly, we’re largely staying away whilst our builder smashes down the walls – we’re on hand to offer words of support and photograph what’s going on. It’s not very pretty at all at the moment, and won’t be for quite some time, but you’ve to crack some eggs to make an omelette, as the saying goes…

The walls to be dismantled were clearly identified and the mallet swung into action.

Unless you know the layout of the building, none of what we are currently doing will make much sense. But, in a nutshell, we are creating three ensuite bedrooms, all with big windows overlooking the valley and Oprtalj, with simple ensuites. Access to each room will be from a newly created corridor to the the rear of the bedrooms. This idea is to work with the main structure of the building and create a very simple, minimalistic, open plan space inside. We’re still negotiating on outside land, so as there is much space inside, we’re stealing some of it from the other end of the building, to create an internal courtyard/potted garden. But that’s all way, way in the future.

At the moment, we’re just delighted that we’re surrounded by rubble and masonry – oh, and wasps because we’ve uncovered a wasps’ nest – because this all means one thing. PROGRESS.

Published on 21st September 2021